Home
About Us
Directors
What people say about us
Quality Assurance
Health & Safety
Environment
Downloads
Latest News
What We Do
Civil Engineering
Water Treatment
Highways
Structures
Specialist Activities
Coastal & River
Infrastructure
Environmental Improvements
Airports
Railways
Building
Contact Us
Southampton HQ
Plymouth
Gatwick
Heathrow
Swansea
Swindon
Luton
Careers
Current Vacancies
Why work for us?
Vacancy Alert sign up
Equal Opportunities
Home
>
What We Do
>
Civil Engineering
>
Structures
>
Norris Pyestock
What We Do
Civil Engineering
Water Treatment
Highways
Structures
Specialist Activities
Coastal & River
Infrastructure
Environmental Improvements
Airports
Railways
Building
Norris Pyestock Bridge Refurbishment
Client
Hampshire County Council
Main Contractor
Dyer & Butler Ltd
Duration
7 Months
Location
Fleet, Hampshire
Office Responsible
High Wycombe
Description
Reconstruction of reinforced concrete parapet string courses, including Hydrodemolition of existing, whilst maintaining full access along the Basingstoke Canal.
Replacement of parapets and safety fencing.
Replace deck waterproofing and carriageway resurfacing.
Existing bridge was jacked up to enable the bearings to be replaced.
Bank stablistation and revetment paving works to the abutment slopes adjacent to the canal.
Website design by
Clickfire
© Dyer & Butler 2012. All rights reserved